Individual Permit: Construction Certifications
Construction Certifications
Enhanced Controls
SMA |
Submittal Date and Letter |
Certification Document |
S-SMA-2 and S-SMA-3.53 |
September , 2024 (see document for submittal letter and certification) |
NPDES Permit No. NM0030759 – Certification of Installation of Enhanced Control Measures for S-SMA-2 and S-SMA-3.53 |
PJ-SMA-3.05, PJ-SMA-9, STRM-SMA-4.2, T-SMA-3, and 2M-SMA-2 |
July 31, 2024 (see document for submittal letter and certification) |
NPDES Permit No. NM0030759 – Certification of Installation of Enhanced Control Measures for PJ-SMA-3.05, PJ-SMA-9, STRM-SMA-4.2, T-SMA-3, and 2M-SMA-2 |
M-SMA-6 |
July 19, 2024 (see document for submittal letter and certification) |
|
LA-SMA-1 |
April 16, 2024 |
|
CHQ-SMA-1.02 |
August 24, 2023 |
|
M-SMA-12.9 |
August 24, 2023 |
|
CDB-SMA-0.15 |
July 5, 2023 (see document for submittal letter and certification) |
|
M-SMA-12 |
July 5, 2023 (see document for submittal letter and certification) |
|
M-SMA-12.5 |
July 5, 2023 (see document for submittal letter and certification) |
|
M-SMA-12.8 |
July 5, 2023 (see document for submittal letter and certification) |
|
M-SMA-13 |
July 5, 2023 (see document for submittal letter and certification) |
|
W-SMA-11.7 |
September 7, 2022 (see document for submittal letter and certification) |
Certification of Installation of Enhanced Control Measures for W-SMA-11.7 |
CHQ-SMA-6 |
June 27, 2022 (see document for submittal letter and certification) |
Certification of Installation of Enhanced Control Measures for CHQ-SMA-6, PJ-SMA-3.05 and PJ-SMA-11 |
PJ-SMA-3.05 |
June 27, 2022 (see document for submittal letter and certification) |
Certification of Installation of Enhanced Control Measures for CHQ-SMA-6, PJ-SMA-3.05 and PJ-SMA-11 |
PJ-SMA-11 |
June 27, 2022 (see document for submittal letter and certification) |
Certification of Installation of Enhanced Control Measures for CHQ-SMA-6, PJ-SMA-3.05 and PJ-SMA-11 |
A-SMA-2 |
March 16, 2022 (see document for submittal letter and certification) |
March 16, 2022 (see document for submittal letter and certification) |
A-SMA-1.1 |
December 7, 2021 (see document for submittal letter and certification) |
|
A-SMA-3 |
December 7, 2021 (see document for submittal letter and certification) |
|
CHQ-SMA-4 |
October 12, 2021 (see document for submittal letter and certification) |
|
3M-SMA-0.2 |
July 15, 2021 (see document for submittal letter and certification) |
|
CDV-SMA-2.42 |
July 15, 2021 (see document for submittal letter and certification) |
|
LA-SMA-5.2 |
July 15, 2021 (see document for submittal letter and certification) |
|
PT-SMA-2 |
July 15, 2021 (see document for submittal letter and certification) |
|
STRM-SMA-1.5 |
July 15, 2021 (see document for submittal letter and certification) |
|
CHQ-SMA-1.02 |
April 21, 2021 (see document for submittal letter and certification) |
|
CHQ-SMA-2 |
April 21, 2021 (see document for submittal letter and certification) |
|
CHQ-SMA-7.1 |
April 21, 2021 (see document for submittal letter and certification) |
|
PJ-SMA-11 |
March 30, 2021 (see document for submittal letter and certification) |
|
CDV-SMA-7 |
December 14, 2020 (see document for submittal letter and certification) |
|
CDV-SMA-9.05 |
December 14, 2020 (see document for submittal letter and certification) |
|
P-SMA-2.2 |
December 14, 2020 (see document for submittal letter and certification) |
|
S-SMA-6 |
December 14, 2020 (see document for submittal letter and certification) |
|
W-SMA-9.5 |
September 10, 2020 (see document for submittal letter and certification) |
|
STRM-SMA-4.2 |
January 14, 2020 (see Document for submittal letter and certification) |
|
2M-SMA-1 |
July 25, 2012 (see document for submittal letter and certification) |
|
2M-SMA-1.7 |
Certification of Enhanced Control Measures for Eight Site Monitoring Areas (pdf) |
|
2M-SMA-1.42 |
July 25, 2012 (see document for submittal letter and certification) |
|
2M-SMA-1.44 |
September 10, 2015 (see document for submittal letter and certification) |
|
July 25, 2012 (see document for submittal letter and certification) |
||
2M-SMA-1.45 |
Certification of Enhanced Control Measures for Eight Site Monitoring Areas (pdf) |
|
2M-SMA-1.65 |
July 25, 2012 (see document for submittal letter and certification) |
|
2M-SMA-2 |
Certification of Installation of Enhanced Control Measures for Five Site Monitoring Areas (pdf) |
|
2M-SMA-3 |
September 10, 2015 (see document for submittal letter and certification) |
|
3M-SMA-0.5 |
October 30, 2015(see document for submittal letter and certification) |
|
3M-SMA-4 |
October 30, 2015(see document for submittal letter and certification) |
|
A-SMA-2 |
August 17, 2015 (see document for submittal letter and certification) |
|
A-SMA-2.7 |
||
A-SMA-3 |
September 10, 2015 (see document for submittal letter and certification) |
|
ACID-SMA-2 |
October 14, 2016(see document for submittal letter and certification) |
|
ACID-SMA-2.1 |
October 14, 2016(see document for submittal letter and certification) |
|
CDB-SMA-0.25 |
July 25, 2012 (see document for submittal letter and certification) |
|
CDB-SMA-1 |
September 10, 2015 (see document for submittal letter and certification)
|
|
Certification of Enhanced Control Measures for Eight Site Monitoring Areas (pdf) |
||
CDV-SMA-1.4 |
Certification of Installation of Enhanced Control Measures for Four Site Monitoring Areas (zip) |
|
CDV-SMA-1.45 |
July 25, 2012 (see document for submittal letter and certification) |
|
CDV-SMA-1.7 |
September 10, 2015 (see document for submittal letter and certification) |
|
CDV-SMA-3 |
July 25, 2012 (see document for submittal letter and certification) |
|
CDV-SMA-2.41 |
Certification of Enhanced Control Measures for Five Site Monitoring Areas |
|
CDV-SMA-2.42 |
September 29, 2015 (see document for submittal letter and certification) |
|
CDV-SMA-6.01 |
October 16, 2015 (see document for submittal letter and certification) |
|
CDV-SMA-6.02 |
July 25, 2012 (see document for submittal letter and certification) |
|
CDV-SMA-7 |
September 10, 2015 (see document for submittal letter and certification) |
|
CHQ-SMA-0.5 |
October 30, 2015(see document for submittal letter and certification) |
|
CHQ-SMA-1.02 |
September 10, 2015 Submittal Letter(pdf) |
|
CHQ-SMA-1.03 |
Certification of Installation of Enhanced Control Measures for Four Site Monitoring Areas (zip) |
|
CHQ-SMA-2 |
October 30, 2015(see document for submittal letter and certification) |
|
CHQ-SMA-3.05 |
August 17, 2015 (see document for submittal letter and certification) |
|
CHQ-SMA-6 |
August 17, 2015 (see document for submittal letter and certification) |
|
DP-SMA-0.3 |
Certification of Installation of Enhanced Control Measures for Five Site Monitoring Areas (pdf) |
|
DP-SMA-3 |
||
F-SMA-2 |
September 29, 2015 (see document for submittal letter and certification) |
|
Certification of Enhanced Control Measures for Five Site Monitoring Areas |
||
LA-SMA-0.85 |
||
LA-SMA-1 |
Certification of Installation of Enhanced Control Measures for Nine Site Monitoring Areas (pdf) |
|
LA-SMA-1.25 |
||
LA-SMA-2.1 |
Certification of Enhanced Control Measures for Four Site Monitoring Areas |
|
LA-SMA-5.31 |
Certification of Enhanced Control Measures for Eight Site Monitoring Areas (pdf) |
|
LA-SMA-5.33 |
Certification of Enhanced Control Measures for Eight Site Monitoring Areas (pdf) |
|
LA-SMA-5.35 |
Certification of Installation of Enhanced Control Measures for Nine Site Monitoring Areas (pdf) |
|
LA-SMA-5.51 |
Certification of Enhanced Control Measures for Five Site Monitoring Areas |
|
LA-SMA-5.52 |
October 30, 2015(see document for submittal letter and certification) |
|
LA-SMA-5.54 |
Certification of Enhanced Control Measures for Four Site Monitoring Areas |
|
LA-SMA-5.91 |
Certification of Installation of Enhanced Control Measures for Five Site Monitoring Areas (pdf) |
|
LA-SMA-5.92 |
October 30, 2015(see document for submittal letter and certification) |
|
LA-SMA-10.12 |
Certification of Installation of Enhanced Control Measures for Nine Site Monitoring Areas (pdf) |
|
M-SMA-1 |
Certification of Installation of Enhanced Control Measures for Nine Site Monitoring Areas (pdf) |
|
M-SMA-1.2 |
Certification of Enhanced Control Measures for Four Site Monitoring Areas |
|
M-SMA-1.22 |
Certification of Installation of Enhanced Control Measures for Five Site Monitoring Areas (pdf) |
|
M-SMA-3 |
October 16, 2015 (see document for submittal letter and certification) |
|
M-SMA-10.01 |
||
PJ-SMA-1.05 |
September 10, 2015 (see document for submittal letter and certification) |
|
PJ-SMA-3.05 |
July 25, 2012 (see document for submittal letter and certification) |
|
PJ-SMA-5 |
August 17, 2015 (see document for submittal letter and certification) |
|
PJ-SMA-5.1 |
July 25, 2012 (see document for submittal letter and certification) |
|
PJ-SMA-9 |
October 30, 2015(see document for submittal letter and certification) |
|
PJ-SMA-10 |
October 30, 2015(see document for submittal letter and certification) |
|
PJ-SMA-11 |
August 17, 2015 (see document for submittal letter and certification) |
|
PJ-SMA-11.1 |
August 17, 2015 (see document for submittal letter and certification) |
|
PJ-SMA-13.7 |
Certification of Installation of Enhanced Control Measures for Five Site Monitoring Areas (pdf) |
|
PRATT-SMA-1.05 |
Certification of Installation of Enhanced Control Measures for Four Site Monitoring Areas (zip) |
|
PT-SMA-0.5 |
Certification of Installation of Enhanced Control Measures for Nine Site Monitoring Areas (pdf) |
|
PT-SMA-1 |
October 16, 2015 (see document for submittal letter and certification) |
|
Certification of Enhanced Control Measures for Eight Site Monitoring Areas (pdf) |
||
PT-SMA-1.7 |
Certification of Enhanced Control Measures for Five Site Monitoring Areas |
|
PT-SMA-2.01 |
Certification of Enhanced Control Measures for Eight Site Monitoring Areas (pdf) |
|
PT-SMA-2 |
September 29, 2015 (see document for submittal letter and certification) |
|
PT-SMA-3 |
August 17, 2015 (see document for submittal letter and certification) |
|
PT-SMA-4.2 |
October 30, 2015(see document for submittal letter and certification) |
|
R-SMA-1.95 |
Certification of Enhanced Control Measures for Four Site Monitoring Areas |
|
S-SMA-0.25 |
Certification of Enhanced Control Measures for Five Site Monitoring Areas |
|
S-SMA-1.1 |
Certification of Installation of Enhanced Control Measures for Nine Site Monitoring Areas (pdf) |
|
S-SMA-2 |
Certification of Installation of Enhanced Control Measures for Five Site Monitoring Areas (pdf) |
|
S-SMA-2.01 |
Certification of Installation of Enhanced Control Measures for Nine Site Monitoring Areas (pdf) |
|
S-SMA-3.53 |
Certification of Installation of Enhanced Control Measures for Five Site Monitoring Areas (pdf) |
|
S-SMA-3.6 |
Certification of Installation of Enhanced Control Measures for Nine Site Monitoring Areas (pdf) |
|
S-SMA-4.1 |
||
S-SMA-6 |
October 16, 2015 (see document for submittal letter and certification) |
|
STRM-SMA-1.5 |
September 10, 2015 (see document for submittal letter)
|
|
Certification of Installation of Enhanced Control Measures for Five Site Monitoring Areas (pdf) |
||
STRM-SMA-1.05 |
Certification of Installation of Enhanced Control Measures for Five Site Monitoring Areas (pdf) |
|
STRM-SMA-4.2 |
Certification of Enhanced Control Measures for Eight Site Monitoring Areas (pdf) |
|
STRM-SMA-5.05 |
July 25, 2012 (see document for submittal letter and certification) |
|
T-SMA-1 |
Certification of Installation of Enhanced Control Measures for Four Site Monitoring Areas (zip) |
|
W-SMA-1 |
Certification of Installation of Enhanced Control Measures for Five Site Monitoring Areas (pdf) |
|
T-SMA-4 |
October 16, 2015 (see document for submittal letter and certification) |
|
W-SMA-1.5 |
September 10, 2015
|
|
W-SMA-2.05 |
||
W-SMA-7 |
September 29, 2015 (see document for submittal letter and certification) |
|
W-SMA-8 |
August 17, 2015 (see document for submittal letter and certification) |
|
W-SMA-8.71 |
September 10, 2015 (see document for submittal letter and certification) |
|
Certification of Installation of Enhanced Control Measures for Nine Site Monitoring Areas (pdf) |
||
W-SMA-9.9 |
July 25, 2012 (see document for submittal letter and certification) |
|
W-SMA-10 |
||
W-SMA-11.7 |
||
W-SMA-14.1 |
||
W-SMA-15.1 |
Baseline Controls
Submittal of Analytical Results following Construction Certification
SMA |
SITE |
Submittal Date |
Document |
CDV-SMA-7 | 15-008(d) | November 4, 2021 | NPDES Permit No. NM0030759 – Analytical Results for Site Monitoring Areas CDV-SMA-7, CDV-SMA-9.05, F-SMA-2, PJ-SMA-11.1, PT-SMA-2, and S-SMA-6 from the First Measurable Storm Event Following Certification of Enhanced Control Measures |
CDV-SMA-9.05 | 15-007(b) | ||
F-SMA-2 | 36-004(c) | ||
PJ-SMA-11.1 | 40-003(b) | ||
PT-SMA-2 | 15-008(f) | ||
36-003(b) | |||
36-004(e) | |||
S-SMA-6 | 72-001 | ||
CDB-SMA-1 | 46-003(c) | October 8, 2021 | NPDES Permit No. NM0030759 – Analytical Results for Si te Monitoring Areas CDB-SMA-1 and CHQ-SMA-0.5 from the First Measurable Storm Event Following Certification of Enhanced Control Measures |
46-004(d2) | |||
46-004(f) | |||
46-004(t) | |||
46-004(w) | |||
46-008(g) | |||
46-009(a) | |||
C-46-001 | |||
CHQ-SMA-0.5 | 33-004(g) | ||
33-007(c) | |||
33-009 | |||
PJ-SMA-9 | 40-009 | September 19, 2021 | NPDES Permit No. NM0030759 – Analytical Results for Site Monitoring Areas PJ-SMA-9 and STRM-SMA-4.2 from the First Measurable Storm Event Following Certification of Enhanced Control Measures |
STRM-SMA-4.2 | 09-008(b) | ||
PJ-SMA-11 | 40-003(a) | August 27, 2021 | NPDES Permit No. NM0030759 – Analytical Results for Site Monitoring Area PJ-SMA-11 from the First Measurable Storm Event Following Certification of Enhanced Control Measures |
CHQ-SMA-1.02 | 33-004(h) | August 6, 2021 | NPDES Permit No. NM0030759 – Analytical Results for Site Monitoring Areas CHQ-SMA-1.02, CHQ-SMA-6, and PJ-SMA-5 from the First Measurable Storm Event Following Certification of Enhanced Control Measures |
33-008(c) | |||
33-011(d) | |||
33-015 | |||
CHQ-SMA-6 | 33-004(j) | ||
33-006(a) | |||
33-007(b) | |||
33-010(c) | |||
33-010(g) | |||
33-010(h) | |||
33-014 | |||
PJ-SMA-5 | 22-015(c) | ||
A-SMA-2 |
39-004(b) |
September 26, 2019 |
|
39-004(c) |
|||
DP-SMA-3 |
21-013(c) |
||
21-021 |
|||
PT-SMA-2 |
15-008(f) |
||
36-003(b) |
|||
36-004(e) |
|||
CDV-SMA-7 |
15-008(d) |
September 18, 2018 (see document for submittal letter) |
|
CHQ-SMA-1.02 |
33-004(h) 33-008(c) 33-011(d) 33-015 |
September 18, 2018 (see document for submittal letter) |
|
CHQ-SMA-2 |
33-004(d) 33-007(c) C-33-003 |
September 18, 2018 (see document for submittal letter) |
|
CHQ-SMA-1.03 |
33-008(c) 33-012(a) 33-017 C-33-001 C-33-003 |
October 11, 2018 (see document for submittal letter) |
|
PT-SMA-4.2 |
36-004(d) |
October 11, 2018 (see document for submittal letter) |
|
PJ-SMA-11 |
40-003(a) |
October 18, 2018 (see document for submittal letter) |
|
A-SMA-3 |
39-002(b) 39-004(c) |
November 6, 2018 (see document for submittal letter) |
|
PJ-SMA-3.05 |
09-004(o) |
November 6, 2018 (see document for submittal letter) |
|
PJ-SMA-5 |
22-015(c) |
November 6, 2018 (see document for submittal letter) |
|
STRM-SMA-1.5 |
08-009(d) |
November 6, 2018 (see document for submittal letter) |
|
ACID-SMA-2 |
01-002(b)-00 |
September 28, 2017(see document for submittal letter) |
|
3M-SMA-4 |
18-002(b) |
September 28, 2017(see document for submittal letter) |
|
PT-SMA-1 |
15-004(f) 15-008(a) |
November 21, 2017(see document for submittal letter) |
|
W-SMA-1.5 |
16-026(b2) 16-028(d) |
November 21 2017(see document for submittal letter) |
|
M-SMA-1.2 |
03-049(a) |
November 21, 2017(see document for submittal letter) |
|
ACID-SMA-2.1 |
01-002(b)-00 |
October 30, 2017(see document for submittal letter) |
|
S-SMA-6 |
72-001 |
October 19, 2017 (see document for submittal letter)) |
|
LA-SMA-2.1 |
01-001(f) |
October 19, 2017(see document for submittal letter) |
|
STRM-SMA-4.2 |
09-008(b) |
September 28, 2017 (see document for submittal letter) |
|
2M-SMA-3 |
07-001(a) 07-001(b) 07-001(c) 07-001(d) |
September 20, 2017 (see document for submittal letter) |
|
CDV-SMA-2.42 |
16-010(b) |
August 28, 2017 (see document for submittal letter) |
|
PJ-SMA-10 |
40-006(a) |
March 6, 2017 (see document for submittal letter) |
|
ACID-SMA-2 |
01-002(b)-00 45-001 45-002 45-004 |
February 9, 2017 (see document for submittal letter) |
|
ACID-SMA-2.1 |
01-002(b)-00 |
February 9, 2017 (see document for submittal letter) |
|
S-SMA-6 |
72-001 |
December 17, 2015 (see document for submittal letter) |
|
2M-SMA-1.42 |
06-001(a) |
October 16, 2015 (see document for submittal letter) |
|
2M-SMA-1.45 |
06-006 |
October 14, 2015 (see document for submittal letter) |
|
LA-SMA-10.12 |
53-008 |
October 16, 2015 |
|
STRM-SMA-5.05 |
09-013 |
October 16, 2015 (see document for submittal letter) |
|
W-SMA-10 |
11-002 |
October 16, 2015 (see document for submittal letter) |
|
LA-SMA-5.35 |
C-41-004 |
September 8, 2014 Submittal Of Analytical Results For Six Site Monitoring Areas (pdf) |
|
LA-SMA-1 |
00-017 |
November 19, 2013 Submittal of Analytical Results from the First Measurable Storm Event for Seventeen Site Monitoring Areas (pdf) |
|
LA-SMA-5.91 |
21-009 |
November 19, 2013 Submittal of Analytical Results from the First Measurable Storm Event for Seventeen Site Monitoring Areas (pdf) |
|
LA-SMA-10.12 |
53-008 |
November 19, 2013 Submittal of Analytical Results from the First Measurable Storm Event for Seventeen Site Monitoring Areas (pdf) |
|
DP-SMA-0.3 |
21-029 |
September 16, 2013 Submittal of Analytical Results for Five Site Monitoring Areas (CDB-SMA-0.25, CHQ-SMA-1.02, DP-SMA-0.3, S-SMA-2, STRM-SMA-1.05) (pdf) |
|
LA-SMA-1.25 |
C-43-001 |
November 7, 2012 Submittal Letter (pdf) |
Certification of Analytical Results for Two Monitoring Sites (pdf) |
S-SMA-1.1 |
03-029 |
September 8, 2014 Submittal Of Analytical Results For Six Site Monitoring Areas (pdf) |
|
S-SMA-3.53 |
03-014(b2) |
September 8, 2014 Submittal Of Analytical Results For Six Site Monitoring Areas (pdf) |
|
CDB-SMA-l |
46-003(c) |
November 19, 2013 Submittal of Analytical Results from the First Measurable Storm Event for Seventeen Site Monitoring Areas (pdf) |
|
M-SMA-1.22 |
03-045(h) |
November 19, 2013 Submittal of Analytical Results from the First Measurable Storm Event for Seventeen Site Monitoring Areas (pdf) |
|
S-SMA-2.01 |
03-052(b) |
November 19, 2013 Submittal of Analytical Results from the First Measurable Storm Event for Seventeen Site Monitoring Areas (pdf) |
|
S-SMA-4.1 |
53-014 |
November 19, 2013 Submittal of Analytical Results from the First Measurable Storm Event for Seventeen Site Monitoring Areas (pdf) |
|
CDB-SMA-0.25 |
46-004(c2) |
September 16, 2013 Submittal of Analytical Results for Five Site Monitoring Areas (CDB-SMA-0.25, CHQ-SMA-1.02, DP-SMA-0.3, S-SMA-2, STRM-SMA-1.05) (pdf) |
|
S-SMA-2 |
03-012(b) |
September 16, 2013 Submittal of Analytical Results for Five Site Monitoring Areas (CDB-SMA-0.25, CHQ-SMA-1.02, DP-SMA-0.3, S-SMA-2, STRM-SMA-1.05) (pdf) |
|
M-SMA-1 |
03-050(a) |
August 22, 2013 Submittal of Analytical Results for Three Site Monitoring Areas (2M-SMA-2, M-SMA-1, S-SMA-3.6) (pdf) |
|
S-SMA-3.6 |
60-007(b) |
August 22, 2013 Submittal of Analytical Results for Three Site Monitoring Areas (2M-SMA-2, M-SMA-1, S-SMA-3.6) (pdf) |
|
M-SMA-10.01 |
35-016(e) |
December 7, 2012 Submittal Letter (pdf) |
|
2M-SMA-1.7 |
03-055(a) |
September 8, 2014 Submittal Of Analytical Results For Six Site Monitoring Areas (pdf) |
|
2M-SMA-1.44 |
06-001(b) |
November 19, 2013 Submittal of Analytical Results from the First Measurable Storm Event for Seventeen Site Monitoring Areas (pdf) |
|
2M-SMA-1.65 |
40-005 |
November 19, 2013 Submittal of Analytical Results from the First Measurable Storm Event for Seventeen Site Monitoring Areas (pdf) |
|
STRM-SMA-1.5 |
08-009(d) |
November 19, 2013 Submittal of Analytical Results from the First Measurable Storm Event for Seventeen Site Monitoring Areas (pdf) |
|
STRM-SMA-1.05 |
08-009(1) |
September 16, 2013 Submittal of Analytical Results for Five Site Monitoring Areas (CDB-SMA-0.25, CHQ-SMA-1.02, DP-SMA-0.3, S-SMA-2, STRM-SMA-1.05) (pdf) |
|
2M-SMA-2 |
03-050(d) |
August 22, 2013 Submittal of Analytical Results for Three Site Monitoring Areas (2M-SMA-2, M-SMA-1, S-SMA-3.6) (pdf) |
|
2M-SMA-1 |
03-010(a) |
November 7, 2012 Submittal Letter (pdf) |
Certification of Analytical Results for Two Monitoring Sites (pdf) |
CDV-SMA-2.41 |
16-018 |
September 8, 2014 Submittal Of Analytical Results For Six Site Monitoring Areas (pdf) |
|
PT-SMA-1 |
15-004(f)15-008(a) |
September 8, 2014 Submittal Of Analytical Results For Six Site Monitoring Areas (pdf) |
|
CDV-SMA-6.02 |
14-002(c) |
November 19, 2013 Submittal of Analytical Results from the First Measurable Storm Event for Seventeen Site Monitoring Areas (pdf) |
|
W-SMA-1 |
16-017(j)-99 |
November 19, 2013 Submittal of Analytical Results from the First Measurable Storm Event for Seventeen Site Monitoring Areas (pdf) |
|
W-SMA-8.71 |
16-004(c) |
November 19, 2013 Submittal of Analytical Results from the First Measurable Storm Event for Seventeen Site Monitoring Areas (pdf) |
|
W-SMA-9.9 |
11-006(b) |
November 19, 2013 Submittal of Analytical Results from the First Measurable Storm Event for Seventeen Site Monitoring Areas (pdf) |
|
W-SMA-11.7 |
49-008(c) |
November 19, 2013 Submittal of Analytical Results from the First Measurable Storm Event for Seventeen Site Monitoring Areas (pdf) |
|
W-SMA-14.1 |
15-004(h) |
November 19, 2013 Submittal of Analytical Results from the First Measurable Storm Event for Seventeen Site Monitoring Areas (pdf) |
|
A-SMA-2.7 |
39-002(c) |
November 19, 2013 Submittal of Analytical Results from the First Measurable Storm Event for Seventeen Site Monitoring Areas (pdf) |
|
CHQ-SMA-1.02 |
33-004(h) |
September 16, 2013 Submittal of Analytical Results for Five Site Monitoring Areas (CDB-SMA-0.25, CHQ-SMA-1.02, DP-SMA-0.3, S-SMA-2, STRM-SMA-1.05) (pdf) |